OrsiCore

Materials library

A plain-English glossary

Drip edge, ridge vent, J-channel, casement. Short definitions for the words that show up on a proposal.

166 materials

  • ACV

    restoration

    Actual cash value: the insurance payment after depreciation is taken out.

  • Addendum

    General

    A page added to a contract that changes or adds terms.

  • Adjuster

    restoration

    The person who inspects the damage and writes the insurance scope.

  • Air sealing

    drywall

    Closing the gaps where air leaks: top plates, wires, cans, and the attic hatch.

  • Allowance

    General

    A placeholder amount in the contract for a choice that is not made yet.

  • Apron flashing

    Roofing

    The metal across the downhill face of a chimney or a wall.

  • Architectural shingle

    Roofing

    A thicker asphalt shingle with a layered look, also called a laminate or dimensional shingle.

  • Argon

    Windows

    A gas sealed between panes that insulates better than ordinary air.

  • Attic ventilation

    Roofing

    A path for outside air to enter low and leave high, so the attic stays closer to the outdoor temperature.

  • Batt

    drywall

    A pre-cut blanket of insulation, usually fiberglass, that fits between studs or joists.

  • Blown-in insulation

    drywall

    Loose insulation blown into an attic or a closed wall.

  • Board and batten

    Siding

    Vertical boards with a narrower strip covering each seam.

  • Bottom plate

    General

    The horizontal board at the bottom of a wall.

  • Building code

    General

    The rules for how the work has to be built in that place.

  • Bundle

    Roofing

    A wrapped package of shingles. Three bundles is the usual square.

  • Butt joint

    drywall

    The seam where two untapered ends of drywall meet.

  • Casement

    Windows

    A window that hinges on the side and cranks open.

  • Caulk

    General

    A flexible sealant in a joint that moves a little.

  • Change order

    General

    A written change to the contract price or the work, signed before the extra work is done.

  • Chimney flashing

    Roofing

    The set of metal pieces that join a chimney to the roof.

  • Closed valley

    Roofing

    A valley covered with shingles, with no metal showing.

  • Code upgrade

    restoration

    Work required because today's code asks for more than the house was built with.

  • Contingency

    General

    Money set aside in a price for the unknowns you can already name.

  • Contract

    General

    The signed agreement: scope, price, schedule, and the terms.

  • Copper flashing

    Roofing

    Flashing made of copper, which lasts and weathers to brown.

  • Corner bead

    drywall

    The metal or plastic strip on an outside drywall corner.

  • Corner post

    Siding

    The trim piece that receives siding at an outside or inside corner.

  • Counterflashing

    Roofing

    The metal cap that covers the top of step or base flashing and is cut into the wall or chimney.

  • Cricket

    Roofing

    A small peaked saddle built behind a chimney so water does not sit there.

  • Cripple

    General

    A short stud above a header or below a window sill.

  • Decking

    Roofing

    The wood sheets nailed to the rafters that the roof is built on.

  • Deductible

    restoration

    The amount of a claim the owner pays before insurance pays.

  • Deposit

    General

    Money paid at signing, before the work starts.

  • Depreciation

    restoration

    The amount an insurer holds back because the damaged item was not new.

  • Designer shingle

    Roofing

    A heavy asphalt shingle cut to look like slate or shake.

  • Double-hung

    Windows

    A window with two sashes that both slide up and down.

  • Downspout

    Gutters

    The vertical pipe that carries gutter water to the ground.

  • Drip cap

    Siding

    A metal piece over a window or door that throws water out past the trim.

  • Drip edge

    Roofing

    A metal strip at the roof edge that kicks water into the gutter.

  • Drywall

    drywall

    The gypsum board that becomes the finished wall and ceiling.

  • Drywall tape

    drywall

    Paper or mesh that bridges the seam between two sheets.

  • Dumpster

    General

    The container the tear-off and demolition leave in.

  • Eave

    Roofing

    The low, level edge of a roof, usually over the gutter.

  • Egress

    Windows

    A window large enough, and close enough to the floor, for a person to climb out in a fire.

  • Elbow

    Gutters

    A bent piece of downspout that turns the water out from the wall.

  • Estimate

    General

    A priced look at the work, sometimes less formal than a proposal.

  • Exhaust vent

    Roofing

    The high opening where attic air leaves, often a ridge vent.

  • Expansion gap

    Siding

    The space left so a material can grow when it warms up.

  • Exposure

    Roofing

    The part of a shingle that still shows after the next course laps over it.

  • Fascia

    Siding

    The flat board on the edge of the roof, where the gutter usually hangs.

  • Fastener

    General

    The nail, screw, or staple that holds a material on.

  • Felt

    Roofing

    The older asphalt-paper underlayment, sold as 15-pound or 30-pound.

  • Fiber cement

    Siding

    A siding made of cement and cellulose that holds paint and does not rot like wood.

  • Flashing

    Roofing

    Sheet metal that turns water away from a joint the shingles cannot seal by themselves.

  • Furring

    Siding

    Strips of wood or metal that hold a finish off the wall and create a gap.

  • Galvanized

    General

    Steel coated with zinc so it rusts more slowly.

  • Gauge

    General

    How thick sheet metal is. A lower gauge number is thicker.

  • Good, better, best

    General

    Three priced options built from the same measurements.

  • Green board

    drywall

    Moisture-resistant drywall, green or blue on the face, for damp rooms.

  • Gutter guard

    Gutters

    A cover that keeps leaves out of the gutter.

  • Gutter hanger

    Gutters

    The bracket that holds the gutter to the fascia.

  • Half-round gutter

    Gutters

    A gutter shaped like a pipe cut in half.

  • Header

    General

    The beam over a window or door that carries the load around the opening.

  • Hip

    Roofing

    The outside corner where two sloping sides of a roof meet.

  • House wrap

    Siding

    A sheet on the wall that blocks liquid water and still lets vapor out.

  • Ice & water shield

    Roofing

    A sticky membrane that seals around nails in the spots where ice and wind drive water uphill.

  • Ice dam

    Roofing

    A ridge of ice at the eave that backs meltwater up under the shingles.

  • Impact-resistant shingle

    Roofing

    A shingle rated to survive hail better than a standard laminate.

  • Inspection

    General

    A visit by the building department, or by the contractor at a milestone, to check the work.

  • Intake vent

    Roofing

    The low opening, usually in the soffit, where attic air comes in.

  • J-channel

    Siding

    The J-shaped trim that catches the cut edge of vinyl siding.

  • Jack stud

    General

    The shorter stud that holds up the end of a header.

  • Jamb

    Windows

    The side or top of a window or door frame.

  • Joint compound

    drywall

    The mud that covers tape and fasteners and is sanded smooth.

  • Joist

    General

    A repeating horizontal member that holds up a floor or a ceiling.

  • K-style gutter

    Gutters

    The common ogee-shaped gutter on most houses.

  • Kick-out flashing

    Roofing

    A small bent piece at the bottom of a roof-to-wall joint that throws water into the gutter.

  • King stud

    General

    The full-height stud on each side of an opening, nailed to the header.

  • Lap siding

    Siding

    Boards installed so each course overlaps the one below.

  • Lead-safe

    General

    Work practices required when disturbing paint that may contain lead, common in houses built before 1978.

  • Leader

    Gutters

    Another name for a downspout, or the pipe that continues it underground.

  • Level 3 finish

    drywall

    Tape and one coat of mud, enough for a wall that will be textured.

  • Level 4 finish

    drywall

    The ordinary smooth wall: tape plus two coats, ready for flat paint.

  • Level 5 finish

    drywall

    A skim coat over the whole wall, not just the joints.

  • Lien waiver

    General

    A signed paper saying a contractor or supplier has been paid and will not file a lien for that money.

  • Linear foot

    General

    A measurement of length, one foot long, used for gutters, ridge, and trim.

  • Load-bearing

    General

    A wall or beam that holds up something above it, not just itself.

  • Low-E

    Windows

    A nearly invisible coating on glass that slows heat passing through a window.

  • Matching

    restoration

    The question of whether a repair has to blend with the rest of the house, not just the damaged spot.

  • Mechanic's lien

    General

    A claim filed against a house by someone who did not get paid for work or materials.

  • Nail zone

    Roofing

    The band on a shingle where the manufacturer says to place the nails.

  • Nailing flange

    Windows

    The fin around a new-construction window that nails to the sheathing.

  • On center

    General

    The spacing from the center of one stud or joist to the center of the next.

  • Open valley

    Roofing

    A valley where a metal trough stays visible between the shingles.

  • Ordinance or law

    restoration

    Insurance coverage for the extra cost of meeting current code.

  • OSB

    Roofing

    Oriented strand board: wood chips pressed into a sheet and used as roof or wall sheathing.

  • Overhead and profit

    restoration

    The contractor's cost of running the company, plus profit, often written as two 10 percents on insurance work.

  • Overlay

    Roofing

    Nailing a new roof over an old one instead of tearing the old one off.

  • Permit

    General

    The city's or township's permission to do the work.

  • Picture window

    Windows

    A fixed window that does not open, used for the view and the light.

  • Pipe boot

    Roofing

    The rubber-and-metal collar that seals a plumbing vent where it comes through the roof.

  • Pitch

    Roofing

    How steep a roof is, written as rise over 12.

  • Plywood

    Roofing

    A sheet of thin wood layers glued with the grain crossing.

  • Primer

    painting

    The first coat that helps the finish stick and seals the surface.

  • Progress draw

    General

    A payment due when a stage of the work is done, not at the very end.

  • Proposal

    General

    An offer: the work, the price, and how long the price is good.

  • Punch list

    General

    The list of small items left to fix at the walkthrough.

  • R-value

    drywall

    A measure of how well insulation slows heat. Higher is more insulation.

  • Rafter

    Roofing

    A sloping roof member that runs from the ridge to the wall.

  • Rain screen

    Siding

    A small air gap behind siding so the wall can dry.

  • Rake

    Roofing

    The sloped edge of a roof at a gable end.

  • RCV

    restoration

    Replacement cost value: the cost to replace the damaged work with something new, before depreciation.

  • Recoverable depreciation

    restoration

    Depreciation the insurer will pay once the repairs are actually done.

  • Retainage

    General

    A percent of each payment held back until the end of the job.

  • Ridge

    Roofing

    The horizontal peak where two roof slopes meet.

  • Ridge cap

    Roofing

    The shingles that bend over the ridge or a hip.

  • Ridge vent

    Roofing

    A vent that runs along the peak and lets hot attic air out.

  • Rough opening

    Windows

    The framed hole in the wall, a little larger than the window that will sit in it.

  • Sash

    Windows

    The framed piece of glass that moves, or the fixed framed glass inside the window unit.

  • Scope of loss

    restoration

    The insurer's list of what they agree to pay for.

  • Scope of work

    General

    The written description of what is included, and the boundary of what is not.

  • Sealant

    General

    A product that closes a joint against water or air. Caulk is one kind.

  • Selection

    General

    A specific product the owner has chosen: the shingle color, the tile, the faucet.

  • Sheathing

    Roofing

    The board that covers framing: roof deck, wall board, or subfloor.

  • SHGC

    Windows

    Solar heat gain coefficient: how much of the sun's heat the glass lets in.

  • Shingle

    Roofing

    The overlapping piece that is the finished surface of a steep roof.

  • Showroom

    General

    The samples the owner looks at before a product is written into the contract.

  • Sill

    Windows

    The bottom of a window, sloped so water falls away from the glass.

  • Slope

    Roofing

    The tilt of a roof, the same idea as pitch.

  • Soffit

    Siding

    The finished underside of the roof overhang.

  • Soffit vent

    Siding

    The perforated panel or strip in the soffit that lets intake air into the attic.

  • SPF

    General

    Spruce, pine, or fir: the common light framing lumber.

  • Splash block

    Gutters

    A small pad on the ground under a downspout.

  • Spray foam

    drywall

    Insulation sprayed as a liquid that expands and air-seals as it cures.

  • Square

    Roofing

    A roofing measure equal to 100 square feet of roof.

  • Square foot

    General

    A measure of area, one foot by one foot.

  • Squares

    Roofing

    The plural of a roofing square: each one is 100 square feet.

  • Starter strip

    Roofing

    The first course at the eave that the first row of shingles seals to.

  • Step flashing

    Roofing

    Small L-shaped pieces woven into each shingle course where a roof meets a wall.

  • Stud

    Siding

    A vertical framing member in a wall, usually wood, spaced 16 or 24 inches apart.

  • Substantial completion

    General

    The point where the house can be used for what the contract promised, even if a punch list remains.

  • Substrate

    General

    Whatever a finish is applied to: the deck under shingles, the board under tile, the wall under paint.

  • Supplement

    restoration

    A request to the insurer for work the first scope missed.

  • Synthetic underlayment

    Roofing

    A plastic sheet underlayment that lies flatter and tears less than felt.

  • Takeoff

    General

    The count of materials and labor taken off the measurements.

  • Tear-off

    Roofing

    Taking the old roof off down to the deck before the new one goes on.

  • Tempered glass

    Windows

    Glass that is heat-treated so it crumbles instead of shattering into spears.

  • Texture

    drywall

    A pattern sprayed or rolled on drywall so the joints hide.

  • Thermal bridging

    drywall

    Heat leaking through the wood studs, which insulate worse than the batts between them.

  • Three-tab shingle

    Roofing

    A flat asphalt shingle with three cutouts along the bottom edge.

  • Top plate

    General

    The horizontal board at the top of a wall that the studs nail to.

  • Trim coil

    Siding

    Painted aluminum in a roll, bent on site to wrap fascia, windows, and door trim.

  • Triple-pane

    Windows

    A window with three layers of glass and two gaps.

  • Truss

    Roofing

    A factory-built roof or floor frame of small boards in triangles.

  • U-factor

    Windows

    How easily heat passes through the whole window. Lower is better insulation.

  • Underlayment

    Roofing

    The layer between the roof deck and the shingles.

  • Unit price

    General

    A price per measured unit: per square, per foot, per window.

  • Valley

    Roofing

    The inside corner where two roof planes meet and a lot of water collects.

  • Vapor barrier

    drywall

    A layer that stops water vapor, not just liquid water.

  • Vinyl siding

    Siding

    Plastic siding panels that hang on the wall and can expand.

  • Warranty

    General

    A promise to stand behind work or a product for a stated time.

  • Waste factor

    Roofing

    The extra material, as a percent, added because cuts and hips do not use full pieces.

  • Weep hole

    Siding

    A small opening that lets water that got behind a finish drain back out.

  • Window flashing

    Windows

    Tape and metal that tie the window frame to the house wrap.

  • WRB

    Siding

    Weather-resistive barrier: the layer, often house wrap, that keeps the wall dry.

  • Z-flashing

    Siding

    A Z-shaped metal piece that sheds water at a horizontal siding joint.